Modelled magnetic field from overhead power lines, against DSA's 0.4 µT investigation level

Modelled magnetic field at the address from nearby overhead power lines, for a typical and a high load, against DSA's 0.4 µT investigation level. An estimate for assumed loads, not a measurement.

power_line_field15 fieldsNot in the demo
Source
Approach model over NVE Nettanlegg overhead lines
Geography
The address point
Reported stale after
60 days
Access
Requires an API key granted this section
Contract version
1
In packages
energy_and_power, calculations

Read about this data source →

Status right now

State
Not measured yet
There is no age measurement for this section yet, or it is measured when requested.
Last loaded
not measured
Data freshness evidence
Not measured yet
Unverified: only collection time is known.
Newest record
not measured

Measured 19 Nov 2026. This is about the section as a whole, not one address: an address outside coverage still gets “not covered”, never “no”.

Available with: bundle or agreed plan, subject to field policy and source grants · Pricing

Model and method

What magnetic field could nearby power lines give at the address?

This is model metadata from the contract. Results are estimates, not observed source facts. Declared maturity and reference comparison do not establish that the current model release is approved or available to the customer.

Result type
Calculation
Method
Physical calculation
Declared maturity
Marked stable in the catalogue
Reference comparison
No qualified comparison declared
Contract version
1
Model artifact and runtime version
Not established by this catalogue description
Inputs, headline fields and comparison basis

Declared inputs

  • NVE power lines and voltage

Headline output fields

field_typical_ut, field_high_load_ut, above_investigation_level_typical, above_investigation_level_high_load, nearest_line_distance_m

Declared comparison basis

no field measurements available; current is assumed

Input names are not a complete training dataset or revision-pinned lineage. Read the caveats and response metadata for what a particular result is based on.

Source terms and reuse

These are declarations from the catalogue contract, not a new rights approval. Customer access, source agreements and privacy need separate assessment. A licence label does not establish coverage or reviewed content.

Declared licence or terms
unverified
Declared redistribution
Not established
Catalogue basis
Unverified
Attribution and note

Shown from the contract in its original language.

Computed by Approach; the terms of its inputs named in source apply and have not been reviewed together.

What this does not say

Quoted verbatim from the section’s warnings field, exactly as the API returns it. They are not translated: a translation would show something other than what your response actually contains.

  • Estimate, not a measurement: the current on a line is not published and is unknown here. The field is computed for an ASSUMED load per voltage class (field_typical_ut for a typical annual mean, field_high_load_ut for a high load); the real field can be lower or higher, and only a measurement over time says what it is.
  • Method emf-flat3-v1: each NVE overhead line within 300 m is modelled as a balanced three-phase line with its conductors side by side at a typical height and spacing for its voltage class, and the field 1 m above ground at the address point's horizontal distance is computed with Biot-Savart (inputs lists every assumed spacing, height and current). The largest single-line figure is served; fields of separate lines are not added because their phases are unknown.
  • above_investigation_level_* compares the figure with 0.4 µT, the annual-mean level at which DSA asks for an investigation of measures when new homes, schools or kindergartens are planned near power lines. It is a planning trigger, not a health limit (the ICNIRP public reference level is 200 µT). A line of unknown voltage within 300 m leaves a false flag null.
  • The NVE dataset holds the regional and central grid: local distribution lines (22 kV and below), cables in the ground, transformers and wiring inside buildings are not included, and they are often the larger source indoors. lines_within_300m 0 means no mapped line within 300 m: the flags are false for the mapped lines and the field is null, not zero.
  • Licence: NVE Nettanlegg via Geonorge, NLOD. Attribution: NVE.
  • validation lists each figure the model is checked by, against the reference named in it. value null with status not_yet_computed means the check has not been run on the data yet; it is not a pass.

Provider-contract fields

5 of 15 fields are value fields — the ones that decide whether a record actually says anything. The rest are context: identifiers, codes and timestamps.

FieldTypeRole
field_typical_utnumber | nullvalue
field_high_load_utnumber | nullvalue
above_investigation_level_typicalboolean | nullvalue
above_investigation_level_high_loadboolean | nullvalue
dominant_line_voltage_kvnumber | nullcontext
dominant_line_distance_minteger | null (m)context
nearest_line_distance_minteger | null (m)value
nearest_line_voltage_kvnumber | nullcontext
lines_within_300minteger | nullcontext
lines_unknown_voltageinteger | nullcontext
methodstring | nullcontext
method_versionstring | nullcontext
inputsobject | nullcontext
validationarray<object> | nullcontext
computed_atstring | nullcontext

Fetch this section

Send the key in the X-API-Key header. The section can be fetched with the rest of the address, or on its own with pagination.

curl --disable --fail-with-body --silent --show-error --connect-timeout 10 --max-time 30 \
  -H "X-API-Key: ${APPROACH_API_KEY:?APPROACH_API_KEY is not set}" \
  'https://api.approach.no/api/v1/addresses/285717643?include=power_line_field'

# paginated, one section at a time
curl --disable --fail-with-body --silent --show-error --connect-timeout 10 --max-time 30 \
  -H "X-API-Key: ${APPROACH_API_KEY:?APPROACH_API_KEY is not set}" \
  'https://api.approach.no/api/v1/addresses/285717643/sections/power_line_field?limit=25'

Why it cannot be tried here

This section is not part of the public demo projection. That is a licensing and privacy decision, not a sign the data is missing: it is served to customers granted the section.