Skip to content

← All sections

Installed solar capacity in the kommune per 1 000 inhabitants (Elhub)

Installed solar capacity registered in Elhub for the address's kommune, per 1 000 inhabitants, with one-year change and the Norwegian figure. Context for the kommune, not whether this building has solar.

local_solar_adoption13 fieldsNot in the demo
Source
Elhub energy data (installed capacity per kommune) and SSB population
Geography
Municipality
Reported stale after
45 days
Access
Requires an approved pilot customer and named section access
Contract version
1
In packages
energy_and_power

Read about this data source →

Status right now

State
Within budget
Combined section status is within the age and schedule budget. Check the separate data timestamp for data freshness.
Last loaded
10 Nov 2026
Data freshness evidence
Within budget
Newest stored data record 10 Nov 2026
Newest record
10 Nov 2026
Municipalities with data
345

Measured 10 Nov 2026. This is about the section as a whole, not one address: an address outside coverage still gets “not covered”, never “no”.

Available with: approved pilot customer and named section access

Source terms and reuse

These are declarations from the catalogue contract, not a new rights approval. Customer access, source agreements and privacy need separate assessment. A licence label does not establish coverage or reviewed content.

Declared licence or terms
unverified
Declared redistribution
Not established
Catalogue basis
Unverified
Attribution and note

Shown from the contract in its original language.

Elhub energy data: reuse terms for the aggregates not confirmed. Pending legal review.

What this does not say

Quoted verbatim from the section’s warnings field, exactly as the API returns it. They are not translated: a translation would show something other than what your response actually contains.

  • Context for the kommune, not the address: all solar production capacity registered in Elhub for the kommune, ground-mounted parks and rooftops alike. It says how common solar is locally, not whether this roof suits it (see solar_potential).
  • Capacity is Elhub's installedCapacity, read as kW (the response states no unit), summed over metering-point types; solar_installed_kw_e18 and _e19 keep Elhub's two metering-point type codes apart as published, without inferring which are rooftop or prosumer installations. Elhub publishes from 2022; the snapshot is the latest published day, and the comparison is the latest snapshot at least a year earlier (null until a year of snapshots is held).
  • Per 1 000 inhabitants uses SSB's newest kommune population (population_year). A kommune merged or split after a snapshot can read wrongly until Elhub and SSB use the same codes.
  • Licence: CC BY 4.0 (Elhub energy data, terms of use on api.elhub.no). Attribution: Elhub AS; population: Statistics Norway (SSB), NLOD.

Provider-contract fields

3 of 13 fields are value fields — the ones that decide whether a record actually says anything. The rest are context: identifiers, codes and timestamps.

FieldTypeRole
municipality_codestring | nullcontext
snapshot_datedate | nullcontext
solar_installed_kwnumber | nullvalue
solar_installed_kw_e18number | nullcontext
solar_installed_kw_e19number | nullcontext
populationinteger | nullcontext
population_yearinteger | null (årstall)context
solar_kw_per_1000_inhabitantsnumber | nullvalue
comparison_snapshot_datedate | nullcontext
solar_installed_kw_year_beforenumber | nullcontext
solar_capacity_change_pct_1ynumber | nullvalue
norway_solar_kw_per_1000_inhabitantsnumber | nullcontext
fetched_attimestamp | nullcontext

Fetch this section

Send the key in the X-API-Key header. The section can be fetched with the rest of the address, or on its own with pagination.

curl --disable --fail-with-body --silent --show-error --connect-timeout 10 --max-time 30 \
  -H "X-API-Key: ${APPROACH_API_KEY:?APPROACH_API_KEY is not set}" \
  'https://api.approach.no/api/v1/addresses/285717643?include=local_solar_adoption'

# paginated, one section at a time
curl --disable --fail-with-body --silent --show-error --connect-timeout 10 --max-time 30 \
  -H "X-API-Key: ${APPROACH_API_KEY:?APPROACH_API_KEY is not set}" \
  'https://api.approach.no/api/v1/addresses/285717643/sections/local_solar_adoption?limit=25'

Why it cannot be tried here

This section is not part of the public demo projection. That is a licensing and privacy decision, not a sign the data is missing: it is served to customers granted the section.