Skip to content

← All sections

Construction cost index for detached houses and blocks of flats

Construction cost index (2015 = 100) from SSB for detached wooden houses and blocks of flats, with 12-month change and a split by trade. Labour and materials, not the price of a finished home.

construction_cost_index9 fields9 of these fields open in the demo
Source
SSB 08653 and 08655 (Byggekostnadsindeks)
Geography
Nationwide
Reported stale after
120 days
Access
Requires an API key granted this section
Contract version
1
In packages
area_context

Read about this data source →

Status right now

State
Within budget
Combined section status is within the age and schedule budget. Check the separate data timestamp for data freshness.
Last loaded
not measured
Data freshness evidence
Within budget
Newest stored data record 7 Nov 2026
Newest record
7 Nov 2026

Measured 22 Nov 2026. This is about the section as a whole, not one address: an address outside coverage still gets “not covered”, never “no”.

Available with: trial key (open fields) · bundle or agreed plan, subject to field policy and source grants · Pricing

Source terms and reuse

These are declarations from the catalogue contract, not a new rights approval. Customer access, source agreements and privacy need separate assessment. A licence label does not establish coverage or reviewed content.

Declared licence or terms
Creative Commons Attribution 4.0
Declared redistribution
Allowed with attribution
Catalogue basis
Publisher terms
Read the publisher terms →
Attribution and note

Shown from the contract in its original language.

© SSB 08653 and 08655 (Byggekostnadsindeks), CC BY 4.0

API warnings

The API returns these notes in warnings.

  • A national index (2015 = 100) of what it costs a builder to put up a detached wooden house (enebolig_tre, SSB 08653) or a block of flats (boligblokk, 08655): labour and materials, not the price of a finished home and not regional. change_12m_pct is the rise since the same month a year earlier.
  • by_trade breaks the total into groundwork, carpentry, painting, plumbing and electrical, each with its own 12-month change; use it to index an old estimate trade by trade rather than with the average.

Provider-contract fields

4 of 9 fields are value fields — the ones that decide whether a record actually says anything. The rest are context: identifiers, codes and timestamps. Fields marked “open” also occur in the demo projection, which may have different field definitions. Other fields require the appropriate field policy and source access, not just a key.

FieldTypeRoleDemo
building_typestring | nullcontextopen
table_idstring | nullcontextopen
work_type_namestring | nullcontextopen
index_monthstring | nullcontextopen
index_valuenumber | nullvalueopen
index_value_year_agonumber | nullvalueopen
change_12m_pctnumber | null (%)valueopen
by_tradearray<object> | nullvalueopen
updated_atstring | nullcontextopen

Fetch this section

Send the key in the X-API-Key header. The section can be fetched with the rest of the address, or on its own with pagination.

curl --disable --fail-with-body --silent --show-error --connect-timeout 10 --max-time 30 \
  -H "X-API-Key: ${APPROACH_API_KEY:?APPROACH_API_KEY is not set}" \
  'https://api.approach.no/api/v1/addresses/285717643?include=construction_cost_index'

# paginated, one section at a time
curl --disable --fail-with-body --silent --show-error --connect-timeout 10 --max-time 30 \
  -H "X-API-Key: ${APPROACH_API_KEY:?APPROACH_API_KEY is not set}" \
  'https://api.approach.no/api/v1/addresses/285717643/sections/construction_cost_index?limit=25'

Try it now

This is a real call against the public demo, from here. What appears below is what the API returned — not a sample.